Recent Projects

WORK HISTORY : ongoing and PROJECT ACCOMPLISHED By

Agri Tech Fertilizer Iskandarabad

PLACING OF 60 tons furnance at ZRK Peshawar ( Using 250 Tons Crane)

 

 

 

image-45e6a46a198c975301c5676b41ca4b87bbb327f036f2ad446341b57ceea51218-V

Strengthening of Urea Reactor at Agri Tech Fertilizer Iskandarabad ( Pak American Fertilizer)

image-88e5143a6356e5d452fddf83920f52ca2462be20ab2d567d3e2f497f2d1b57f6-V

Urea Reactor Re-enforcing structure . Fabrication – Erection by Asiacon.
At elevation of 42 . Using 180 Tons Liebherr

 

  image-1385661218619-V

image-a311fb90c64fba2bc6695a75ee5fec2d518b0d64d3638189f9501469719c75cf-V image-b5278bb2f1c7200165bd83fcaaa1f2b73f21f931e8a9bda65b4c99bdff21a97f-V (1) image-c6f4c30d7c2b545a8b789dad28c0be69fc87f933f940d6958ab9535f3eebad43-V image-d77b70f8d46bb7b969dc119d5f36117e4301a2ef74c3351ea177de3b4cc66a1d-V image-ff5eb2cbc4773c459926549956061c646b492ebff92f88426d83f1f0ececdf9b-VOLYMPUS DIGITAL CAMERASAMSUNG SAMSUNG SAMSUNG SAMSUNG SAMSUNG SAMSUNG

 

07

No.

Client Name

Name of Project

Plant Capacity & Location

Contract Value

(US $)

Scope

of

Work Category

Major Work

Volume

Construction Period

Manpower

(Men/Day)

Peak

Total

  •  

ZRK Group Pwshawar

ongoing

Erection of 65 tons Furnace at a redius of 22M .

100%

Feb 2014

8

8

1

1

Agri Tech. Fertilizer ( Pak American Fertilizer Ltd)

ongoing

Strengthening of urea reactor at elevation of 25M to 42 M . fabrication and erection.

100%

ongoing

35

35

1

  • 1

Bridge at river indus ( Amri ,Qazi Ahmed)

100,000/-

Girder launching and transportation

at Qazi Ahmed Sindh.

77 numbers of beams having 100 tons weight each .

80%

2013

25

25

1

  • 1

Nestle Pakistan (Shekhupura)

40,000/-

Erection of 18 Tons 5 numbers vessels having 22Meter length over 25 meter high building at radius of 23Meter.

100%

2012

10

10

Ibrahim Fiber.

Shakar Gang Ltd.

50,000/-

Erection of stain less steel tank at a height of 15 meter.

Erection of Smoke chimney 40Meter high

70%

2012

10

10

1

  • 1

Nelum Jehlum Hydro power Project.

(CMEC)

15,000/-

Installation of 275 Tons crane for power house 1 Km inside tunnel .

100%

2012

35

35

1

  • 1

Maple leaf cement Project  Iskandarabad Mianwali

6521,739

  • Fabrication and Erection of machinery 6700 T.P.D having capacity 5500 ton ( site fabrication).
  • Complete Fabrication/Erection Installation of clay shed having 2000 Ton.
  • Mechanical erection/Dismantling and Refractory installation of 500 T.P.D white cement plant.
  • Fabrication/ Dismantling /Erection of equipment 3300 TPD up gradation 260 Tons.
  • Installation erection of machinery dry process  complete cement plant 3300 TPD.

60%

2004-2007

900

400

Basha Dam Project . Challas Diamer Kohistan

(WAPDA)

50,000

Cable way for Bhasha Dam .

100%

2002-2003

50

50

Ghazi Barhota Dam contract . Ghazi

167,415

  • Placement of 100 Tons 250 Nos concrete Beams.

40%

2001-2002

35

35

Maple leaf cement Project  Iskandarabad Mianwali

  • -Installation Erection from cooler to packaging plant complete 3300T.P.D.
  • Installation Erection  and commissioning of 5 units E.P for Environment Control.
  • Fabrication of columns and rafters over the clay storage 980 Tons.
  • Fabrication and erection of Coal firing systems.

75%

1996-1997

200

200

Army Welfare Trust Cement Plant Nizampur

898,876

  • Installation erection of machinery Dry process complete Cement plant 2000T.P.D.

65%

1995-1996

160

160

Associate Cement Wah

337,078

  • Installation erection of machinery Dry process complete Cement plant 3000T.P.D.

65%

1993-1994

140

140

Fecto cement Ltd Sangjani Pakistan.

280,898

  • Installation Erection insulation and piping of complete Machinery of dry process cement plant of 2000 T.P.D .Capacity of fulers designs.

70%

1988-1989

125

125

State Cement Corp. D.G Khan Pakistan

67,415

  • Installation Erection insulation and piping of raw material crushing and conveying system

40%

1985-1986

100

100

Attock cement Pakistan Limited Karachi.

449,438

  • Erection, Installation of machinery Dry process cement plant of 200 T.P.D.capacity.

35%

1983-1984

80

80

Mustehkam Cement Limited Hattar

134,831

  • Installation Erection of plant and machinery for complete dry process plant of 2000 T.P.D.

45%

1980-1981

79

79

Javadan Cement works Karachi

15,730

Fabrication and erection of two oil tanks and ancillary piping.

25%

1983

55

55

Khan Pur Dam Taxila (WAPDA)

168,716

Installation Erection commissioning of Khan pur Dam spill way gates and other allied jobs.

60%

1980-1981

70

70

Karachi Port Trust Karachi

31,460

Laying welding of 10” Dia pipe line and erection of bunkering mains

Berts no. 1,2,3,4,21,23,24

job carried out under the supervision of world bank.

42%

1980

70

70

National Refinery Karachi

73,033

Installation Erection and commissioning of benzene Toluene Xylene (BTX plant)

100%

1977-1978

89

89

National Refinery Limited Karachi

129,213

Fabrication erection piping and installation of steel storage tanks for asphalt with heating coils 60 inch Dia 38 inch height .

40%

1976-1977

80

80

National Refinery Limited Karachi

28,089

Complete erection , piping insulation and commissioning of water tube boiler 50 tons/hr steam rising capacity .

40%

1975-1976

120

120

National petrocarbon limited Karachi

179,775

Erection , piping and painting of carbon black plant

56%

1978-1979

65

65

Govt of Baluchistan Pakistan petroleum. Baluchistan.

38,202

Fabrication and erection of steel structure .

Equipment/Machinery and commissioning of barites grinding mill at khuzdar.

30%

1975-1976

55

55

National Petro Carbon Karachi.

168,539

Installation erection commissioning of carbon black plant pipry .

54%

1978-1979

70

70

Zulfiqar Industries LTD Karachi

16,853

Fabrication erection Interconnecting pipe. Painting and insulation of 400 tons steel storage tanks with heating coils. 40′ Dia and 30′ height.

46%

1975-1976

50

50

Zulfiqar Industries LTD Karachi

22,471

Fabrication erection piping insulation and painting of a soap and glycerin plant.

32%

1975-1976

50

50

National detergents Kotri

67,415

Fabrication erection piping of a detergent plant of 200kg per hour capacity .

30%

1981-1982

40

40

HIGH PRESSURE PIPE LINE jobs at different sites.

ASIACON Is an Oil & Gas Development Corporation Pre-qualified contractor for piping job.

A list of few jobs of pipeline recently completed by the company

  • Laying of 110 Tons 10” to 12” High Pressure Water & Oil line for Carbon Block Plant.
  • Laying of 100 Tons 10” to 12” High Pressure Water & Oil line for Pak HY-OILS.
  • Laying of 220 Tons 10” to 12” High Pressure Water & Oil line for National Refinery Karachi.
  • Laying of 250 Tons 10” to 12” water line for Facto Cement Islamabad.
  • Laying of 350 Tons 10” to 12” Water & Oil line for Army Welfare Trust Cement plant.
  • Laying of 350 Tons 10” to 12” Water & Oil line for Associated Cement Wah.
  • Laying of 200 Tons 10” to 12” Water & Oil line for Maple Leaf Cement.
  • Laying of 200 Tons 10” to 18” 5km Over head Coal Transport High Pressure for Maple Leaf Cement.

 