WORK HISTORY : ongoing and PROJECT ACCOMPLISHED By

Strengthening of Urea Reactor at Agri Tech Fertilizer Iskandarabad ( Pak American Fertilizer)

Urea Reactor Re-enforcing structure . Fabrication – Erection by Asiacon.
At elevation of 42 . Using 180 Tons Liebherr

No. |
Client Name Name of Project Plant Capacity & Location |
Contract Value (US $) |
Scope of Work Category |
Major Work Volume |
Construction Period |
Manpower (Men/Day) |
|||
Peak |
Total |
||||||||
|
ZRK Group Pwshawar |
ongoing |
Erection of 65 tons Furnace at a redius of 22M . |
100% |
Feb 2014 |
8 |
8 |
||
1 1 |
Agri Tech. Fertilizer ( Pak American Fertilizer Ltd) |
ongoing |
Strengthening of urea reactor at elevation of 25M to 42 M . fabrication and erection. |
100% |
ongoing |
35 |
35 |
||
1
|
Bridge at river indus ( Amri ,Qazi Ahmed) |
100,000/- |
Girder launching and transportation at Qazi Ahmed Sindh. 77 numbers of beams having 100 tons weight each . |
80% |
2013 |
25 |
25 |
||
1
|
Nestle Pakistan (Shekhupura) |
40,000/- |
Erection of 18 Tons 5 numbers vessels having 22Meter length over 25 meter high building at radius of 23Meter. |
100% |
2012 |
10 |
10 |
||
Ibrahim Fiber. Shakar Gang Ltd. |
50,000/- |
Erection of stain less steel tank at a height of 15 meter. Erection of Smoke chimney 40Meter high |
70% |
2012 |
10 |
10 |
|||
1
|
Nelum Jehlum Hydro power Project. (CMEC) |
15,000/- |
Installation of 275 Tons crane for power house 1 Km inside tunnel . |
100% |
2012 |
35 |
35 |
||
1
|
Maple leaf cement Project Iskandarabad Mianwali |
6521,739 |
|
60% |
2004-2007 |
900 |
400 |
||
Basha Dam Project . Challas Diamer Kohistan (WAPDA) |
50,000 |
Cable way for Bhasha Dam . |
100% |
2002-2003 |
50 |
50 |
|||
Ghazi Barhota Dam contract . Ghazi |
167,415 |
|
40% |
2001-2002 |
35 |
35 |
|||
Maple leaf cement Project Iskandarabad Mianwali |
|
75% |
1996-1997 |
200 |
200 |
||||
Army Welfare Trust Cement Plant Nizampur |
898,876 |
|
65% |
1995-1996 |
160 |
160 |
|||
Associate Cement Wah |
337,078 |
|
65% |
1993-1994 |
140 |
140 |
|||
Fecto cement Ltd Sangjani Pakistan. |
280,898 |
|
70% |
1988-1989 |
125 |
125 |
|||
State Cement Corp. D.G Khan Pakistan
|
67,415 |
|
40% |
1985-1986 |
100 |
100 |
|||
Attock cement Pakistan Limited Karachi. |
449,438 |
|
35% |
1983-1984 |
80 |
80 |
|||
Mustehkam Cement Limited Hattar |
134,831 |
|
45% |
1980-1981 |
79 |
79 |
|||
Javadan Cement works Karachi |
15,730 |
Fabrication and erection of two oil tanks and ancillary piping. |
25% |
1983 |
55 |
55 |
|||
Khan Pur Dam Taxila (WAPDA) |
168,716 |
Installation Erection commissioning of Khan pur Dam spill way gates and other allied jobs. |
60% |
1980-1981 |
70 |
70 |
|||
Karachi Port Trust Karachi |
31,460 |
Laying welding of 10” Dia pipe line and erection of bunkering mains Berts no. 1,2,3,4,21,23,24 job carried out under the supervision of world bank. |
42% |
1980 |
70 |
70 |
|||
National Refinery Karachi |
73,033 |
Installation Erection and commissioning of benzene Toluene Xylene (BTX plant) |
100% |
1977-1978 |
89 |
89 |
|||
National Refinery Limited Karachi |
129,213 |
Fabrication erection piping and installation of steel storage tanks for asphalt with heating coils 60 inch Dia 38 inch height . |
40% |
1976-1977 |
80 |
80 |
|||
National Refinery Limited Karachi |
28,089 |
Complete erection , piping insulation and commissioning of water tube boiler 50 tons/hr steam rising capacity . |
40% |
1975-1976 |
120 |
120 |
|||
National petrocarbon limited Karachi |
179,775 |
Erection , piping and painting of carbon black plant |
56% |
1978-1979 |
65 |
65 |
|||
Govt of Baluchistan Pakistan petroleum. Baluchistan. |
38,202 |
Fabrication and erection of steel structure . Equipment/Machinery and commissioning of barites grinding mill at khuzdar. |
30% |
1975-1976 |
55 |
55 |
|||
National Petro Carbon Karachi. |
168,539 |
Installation erection commissioning of carbon black plant pipry . |
54% |
1978-1979 |
70 |
70 |
|||
Zulfiqar Industries LTD Karachi |
16,853 |
Fabrication erection Interconnecting pipe. Painting and insulation of 400 tons steel storage tanks with heating coils. 40′ Dia and 30′ height. |
46% |
1975-1976 |
50 |
50 |
|||
Zulfiqar Industries LTD Karachi |
22,471 |
Fabrication erection piping insulation and painting of a soap and glycerin plant. |
32% |
1975-1976 |
50 |
50 |
|||
National detergents Kotri |
67,415 |
Fabrication erection piping of a detergent plant of 200kg per hour capacity . |
30% |
1981-1982 |
40 |
40 |
|||
HIGH PRESSURE PIPE LINE jobs at different sites.
ASIACON Is an Oil & Gas Development Corporation Pre-qualified contractor for piping job.
A list of few jobs of pipeline recently completed by the company
- Laying of 110 Tons 10” to 12” High Pressure Water & Oil line for Carbon Block Plant.
- Laying of 100 Tons 10” to 12” High Pressure Water & Oil line for Pak HY-OILS.
- Laying of 220 Tons 10” to 12” High Pressure Water & Oil line for National Refinery Karachi.
- Laying of 250 Tons 10” to 12” water line for Facto Cement Islamabad.
- Laying of 350 Tons 10” to 12” Water & Oil line for Army Welfare Trust Cement plant.
- Laying of 350 Tons 10” to 12” Water & Oil line for Associated Cement Wah.
- Laying of 200 Tons 10” to 12” Water & Oil line for Maple Leaf Cement.
- Laying of 200 Tons 10” to 18” 5km Over head Coal Transport High Pressure for Maple Leaf Cement.